APAC data-center expansion faces financing, permitting and power constraints
DataNews Editorial Team
Several APAC data-center developments have been delayed or halted amid tighter financing conditions, permitting gaps and rising power-system pressure. Firmus withdrew its planned AU$7.1 billion IPO, PLDT deferred the Vitro REIT listing to 2027, West Java halted BDX’s 640 MW project, and Thailand suspended 166 data-center projects while it prepares new industry rules.
- Firmus withdrew its planned AU$7.1 billion IPO and intends to pursue up to US$3 billion in private fundraising.
- PLDT deferred its Vitro data-center REIT listing to 2027 amid market conditions and higher interest rates.
- West Java halted BDX’s 640 MW project over missing key approvals, including an environmental assessment.
- Thailand suspended 166 data-center projects while preparing new sector rules; 49 were under construction and 117 awaited approval.
- Malaysia’s energy regulator linked data-center development to electricity-demand growth approaching 10% annually.
APAC’s data-center buildout is encountering simultaneous constraints in capital markets, regulation and power infrastructure, with recent developments across Australia, the Philippines, Indonesia, Thailand and Malaysia highlighting execution risks for new capacity.
Firmus withdrew its planned AU$7.1 billion IPO, equivalent to US$4.97 billion, and now intends to seek up to US$3 billion through private fundraising. Separately, CDC Data Centers removed Firmus from a joint Australian AI-infrastructure project, citing concerns over Firmus’s expansion in Southeast Asia. The episode underscores the sensitivity of large-scale infrastructure plans to financing availability and investor confidence.
In the Philippines, PLDT has postponed the planned listing of its Vitro data-center REIT until 2027, citing market conditions and higher interest rates. The listing had been expected to raise up to PHP24.2 billion, or US$385.1 million. The Philippine central bank had recently raised interest rates by 25 basis points, adding to funding-cost pressure for capital-intensive digital-infrastructure assets.
Permitting is also affecting project execution. Authorities in Indonesia’s West Java province halted Singapore-based BDX’s 640 MW project because key approvals, including an environmental assessment, were absent. The 640 MW figure is reported as total project capacity; the available material does not specify whether it refers to IT load, total campus power or another measure. No timeline for a potential restart has been provided.
Thailand has suspended 166 data-center projects while developing new industry rules. Of these, 49 were under construction and 117 were awaiting approval. The suspension does not establish whether, or when, the projects will proceed.
Power availability is emerging as a parallel constraint. According to the head of the Malaysian Energy Commission, annual electricity-demand growth has increased from roughly 1.5–2% to nearly 10%, attributed to data-center development. The statement does not provide a measurement period or methodology.
Taken together, these developments could point to greater capital selectivity and slower progression from announced projects to construction and operations across APAC. Long-term power arrangements, environmental and other permitting requirements, and the availability of financing may become as consequential to project delivery as underlying demand.
The cases indicate that APAC data-center delivery is being constrained by more than demand for AI infrastructure. Cost and availability of capital, investor appetite, permitting and environmental review, and electricity-system readiness could all slow the conversion of announced capacity into construction and operational assets.
- — / October 10, 2026 · EnglishSource →
This article was prepared by the DataNews editorial team based on the sources listed above.