Skip to content
News

Hitachi Prototypes GPU Cold Plate as Furukawa Electric Plans Cooling-Component Capacity Expansion

DataNews Editorial Team

Image source: primary source

Hitachi has announced a prototype liquid-cooling cold plate for GPUs, while Furukawa Electric has outlined approximately JPY55 billion in planned investment to expand production of liquid-cooling modules and air-cooled heat sinks. The moves target rising thermal loads from AI and GPU infrastructure.

Highlights
  • Hitachi’s GPU liquid-cooling cold plate is at prototype stage and incorporates a U-shaped internal tunnel channel.
  • Hitachi claims a potential 30% reduction in cooling electricity for rejecting GPU heat outdoors under modeled major-city ambient conditions.
  • Furukawa Electric plans approximately JPY55 billion of cooling-component manufacturing investment, principally for water-cooling modules.
  • The planned manufacturing expansion covers the Philippines, Thailand and China.
  • Furukawa Electric’s fiscal 2027 and fiscal 2030 water-cooling-module revenue figures are targets, not reported results.

Hitachi has presented a prototype GPU cold plate for liquid cooling featuring an internal U-shaped tunnel channel. The company says that, under outdoor-temperature conditions in major cities, the design could reduce by 30% the cooling electricity required to reject recovered GPU heat to the outside environment.

The cold plate remains a prototype. The available information does not establish commercial deployment or operational use in a data center, and the stated energy reduction is based on Hitachi’s calculation rather than independently reported operating results.

Separately, Furukawa Electric has announced plans to invest approximately JPY55 billion in expanding manufacturing capacity for water-cooling modules for CPUs and GPUs, as well as air-cooled heat sinks. Of that total, about JPY51 billion is allocated to water-cooling modules and about JPY4 billion to air-cooled heat sinks. The planned expansion covers manufacturing sites in the Philippines, Thailand and China.

Furukawa Electric is targeting water-cooling-module sales of more than JPY100 billion in fiscal 2027 and JPY400 billion in fiscal 2030. These are forward commercial targets rather than reported revenue or confirmed production output.

For AI data-center operators and infrastructure suppliers, the announcements highlight the shift from predominantly air-based thermal management toward specialized liquid-cooling solutions for GPU workloads. This could increase demand both for integrated cooling infrastructure—including cooling systems, pumps, chillers and controls—and for high-volume supply of contact modules and heat sinks. However, Hitachi’s technology has not been described as commercially deployed, while Furukawa Electric’s capacity expansion and sales objectives remain announced plans.

Why It Matters

As GPU density and heat output increase, heat-rejection efficiency and liquid cooling are becoming central to data-center economics and scalable AI infrastructure. Hitachi’s prototype and Furukawa Electric’s planned manufacturing expansion could signal intensifying competition across the AI data-center cooling supply chain, from contact-level components to integrated thermal infrastructure.

Sources

This article was prepared by the DataNews editorial team based on the sources listed above.