Skip to content
News

NTT Innovative Devices Consortium Begins R&D on Optical Chiplet Manufacturing

DataNews Editorial Team

NTT Innovative Devices is collaborating with Japan Semiconductor, Furukawa Electric and Shinko Electric on R&D for mass-production technologies for photonic-electronic convergence devices and optical chiplets. The consortium aims to raise optical-chiplet production throughput by at least tenfold and establish a commercially viable pilot line in Japan.

Highlights
  • The consortium is pursuing R&D rather than confirmed commercial production or deployment.
  • Its stated target is to increase optical-chiplet production throughput by at least 10x.
  • The proposed Japanese pilot line spans materials, wafers, packaging, inspection, integration and testing.
  • Optical interconnects may help address copper-related power and thermal constraints in scaling AI compute systems.
  • Commercial relevance will depend on yield, cost and manufacturing stability.

NTT Innovative Devices, NTT’s hardware unit, has announced an R&D collaboration with Japan Semiconductor, Furukawa Electric and Shinko Electric focused on manufacturing technologies for photonic-electronic convergence devices and optical chiplets.

The project targets at least a tenfold increase in optical-chiplet production throughput. The partners also intend to establish a commercially viable pilot production line in Japan, combining optical materials, silicon wafers for optical circuits, optical components, precision packaging, automated inspection, system integration and testing.

The R&D programme has been selected for NEDO support. A headline cited in the source refers to ¥16 billion in NEDO support, although the available material provides no funding terms, schedule or expenditure breakdown.

The initiative addresses a developing infrastructure constraint for AI systems: copper interconnects can impose losses, thermal load and power-consumption limits as server and compute architectures scale. Optical chiplets could become an important building block for higher-speed, more energy-efficient connections between compute components and servers if the consortium achieves reliable, cost-effective volume manufacturing.

For the data-center market, the practical impact remains contingent on manufacturing yield, cost and production stability. The project is at the R&D and pilot-line stage; the available information does not establish serial production, commercial availability, customer deployments or implementation in specific data centers.

Why It Matters

For AI data-center infrastructure, copper interconnect losses, heat and power consumption are increasingly constraining system scaling. If the consortium can translate the technology into stable high-volume production, optical chiplets could support faster and more energy-efficient links among compute components and servers.

Sources

This article was prepared by the DataNews editorial team based on the sources listed above.