Skip to content
News

UMC and AP Memory Announce AI/HPC Power-Delivery Collaboration

DataNews Editorial Team

TechNews — article illustration
Image source: TechNews

UMC and AP Memory have announced a technical and manufacturing collaboration on power-delivery solutions for AI and HPC systems. AP Memory’s DTC-based S-SiCapTM Gen2D discrete silicon capacitor design completed tape-out and initial functional verification in the third quarter of 2026.

Highlights
  • UMC and AP Memory are collaborating on AI/HPC power-delivery components using UMC’s DTC process and AP Memory’s silicon-capacitor design.
  • S-SiCapTM Gen2D completed tape-out and initial functional verification in Q3 2026.
  • Full-system performance and reliability testing in package substrates is the next stated development stage.
  • The work targets power integrity near compute chips and may extend to interposer-embedded and substrate-backside capacitor configurations.
  • The announcement concerns component and advanced-packaging development, not commercial deployment or new data-center capacity.

UMC and AP Memory have begun a technical and manufacturing collaboration focused on power-delivery solutions for AI and HPC systems targeting next-generation data-center requirements.

The partnership combines UMC’s deep trench capacitor (DTC) process and scalable foundry manufacturing with AP Memory’s silicon-capacitor design and system-integration work. The companies intend to move capacitors closer to compute chips, including into interposers or package substrates, to shorten the power-delivery path and improve power integrity.

AP Memory’s DTC-based S-SiCapTM Gen2D discrete silicon capacitor design reached tape-out and initial functional verification in the third quarter of 2026. The next stated step is full-system performance and reliability testing of the capacitors in package substrates.

The companies are also considering extensions to capacitors embedded in silicon interposers and capacitors placed on the backside of package substrates. These approaches remain under development rather than commercially deployed data-center technology.

For data-center operators and AI infrastructure suppliers, the significance is at the server-platform and advanced-packaging layer, not as an announcement of new data-center capacity or energy infrastructure. As AI and HPC loads increase pressure on conventional PCB-level power delivery, successful system qualification could enable denser and more stable power delivery for advanced compute packages.

Why It Matters

Rising AI and HPC power densities are exposing limits in conventional board-level power delivery. If the technology completes system qualification, placing capacitors closer to compute devices could support denser, more stable power delivery in advanced server packages used in data-center infrastructure.

Sources

This article was prepared by the DataNews editorial team based on the sources listed above.

UMC and AP Memory Announce AI/HPC Power-Delivery Collaboration — DataNews