Williams Develops 400 MW of Planned Gas Generation for New Albany Data-Center Demand
DataNews Editorial Team
Williams is developing the Socrates North and Socrates South gas-generation projects in New Albany, Ohio, to support rising data-center electricity demand. The two facilities have a combined planned capacity of 400 MW.
- Williams is developing the Socrates North and Socrates South gas-generation projects in New Albany, Ohio.
- The facilities have a combined planned capacity of 400 MW.
- The projects are intended to support growing data-center electricity demand.
- Dedicated gas infrastructure and local generation could become more relevant where grid interconnection timelines constrain data-center deployment.
- U.S. data centers consumed an estimated 176 TWh in 2023; projections for their 2030 share of U.S. electricity demand range from 9.5% to 15.3%.
Williams is developing two gas-generation facilities, Socrates North and Socrates South, in New Albany, Ohio, for growing data-center power demand. Their combined planned capacity is 400 MW.
The development reflects a broader push by data-center projects to secure dedicated energy infrastructure as grid constraints affect the availability and timing of conventional utility interconnections. Greylock Energy said it is receiving inquiries from prospective data-center developments on dedicated gas infrastructure on an almost weekly basis.
For operators and developers, local gas generation and direct gas supply may be considered alongside grid interconnection where reliable power must be available on a faster development schedule. This can expand infrastructure requirements beyond generation equipment to gas transportation, compression, metering and associated services.
The demand backdrop is substantial. U.S. data centers consumed an estimated 176 TWh of electricity in 2023, equivalent to about 4.4% of total U.S. electricity consumption. Their share could reach approximately 11.8% by 2030, with an estimated range of 9.5% to 15.3% depending on assumptions around server deployment, efficiency and cooling.
Williams' 400 MW figure is a planned combined capacity for the two Socrates projects, rather than commissioned capacity. No construction timetable, in-service date, investment level, individual project specifications or fuel-supply terms were disclosed.
The projects underscore how grid-connection constraints and delays are shaping data-center power architecture. Dedicated gas infrastructure and on-site generation could provide an alternative or complement to conventional grid supply where interconnection timelines do not align with data-center delivery schedules.
- — / October 22, 2026 · EnglishSource →
This article was prepared by the DataNews editorial team based on the sources listed above.