Research, white papers, reports, and presentations on data centers, energy, and modern infrastructure from around the world.
Academic Paper·arXiv (preprint)·30 September 2026·Power & Energy Supply
The paper introduces FissionReady, a scheduler for data centers supplied by a multi-module small modular reactor (SMR) plant. It jointly manages the output of each reactor module, deferrable batch workloads, and grid purchases while accounting for fuel age, iodine-xenon dynamics, and reactivity margin. In simulations, the approach eliminates forced outages and missed batch-job deadlines while reducing water use and grid-electricity costs relative to a comparable baseline configuration.
Small Modular Reactors (SMRs)Data Center Power SupplyGeneration Load FollowingData Center Microgrids
Details →Academic Paper·arXiv (preprint)·29 September 2026·Power & Energy Supply
This research paper presents a method for quantifying the electricity-demand flexibility that AI data centers can provide to the power system. The approach reschedules batch computing workloads subject to constraints on delay, uninterrupted execution, and available CPU, GPU, and memory resources. Task-scheduling decisions are translated into a server power profile, which is then used to assess peak-shaving potential and the duration for which a load reduction can be sustained, using real GPU-cluster traces.
AI Data CentersDemand FlexibilityLoad ManagementBatch Workload Shifting
Details →Academic Paper·arXiv (preprint)·28 September 2026·Power & Energy Supply
This technical paper from Dominion Energy examines how scenario-based system-load forecasts at different time granularities can support long-term assessment of planned transmission outages. It is set against rapid growth in hyperscale data-center and AI load in Northern Virginia, which requires new and reinforced grid infrastructure. The authors compare the conventional use of monthly or seasonal peak demand with coordinated daily, weekly, and monthly forecasts, finding that the latter can enable more outage coordination without weakening the N-1 reliability criterion.
AI data-center loadLarge-load interconnectionPlanned grid outagesTransmission grid
Details →Academic Paper·arXiv (preprint)·25 December 2025·Cooling & Thermal
This study presents a proof-of-concept coolant-leak monitoring system for direct-to-chip liquid cooling in GPU-focused data centers. Its architecture combines an LSTM model for probabilistic forecasting of time to leak with a Random Forest model for rapid detection of leaks that have already occurred, using MQTT, InfluxDB, and Streamlit for data flow and visualization. The evaluation relies solely on synthetic data aligned with ASHRAE 2021, meaning that the reported performance and energy benefits require validation at live sites.
Data centersAI infrastructureLiquid coolingDirect-to-chip cooling
Details →Academic Paper·DeepMind·11 November 2022·Operations & Efficiency
A technical paper by DeepMind, Google, and Trane on controlling commercial-building chiller plants using reinforcement learning (RL). The authors describe BCOOLER, a system that generates safe recommendations for setpoints and equipment configurations based on BMS data, energy-use forecasts, and operating constraints. In real-world A/B experiments at two sites, the system reduced energy consumption by 9% and 13%, respectively, compared with Trane’s heuristic Sequence of Operations (SOO).
Reinforcement LearningAI-based HVAC controlChiller plantsData center cooling
Details →