Research, white papers, reports, and presentations on data centers, energy, and modern infrastructure from around the world.

White PaperNVIDIA27 May 2026IT & AI Infrastructure

NVIDIA Enterprise AI Factory Design Guide

This NVIDIA white paper provides a framework for building single-tenant enterprise AI factories. It describes a starting reference architecture and an ecosystem approach that brings together accelerated computing, high-performance networking, storage systems, and AI software. The guide is intended for partners and enterprise teams responsible for infrastructure design, procurement, and operations.

AI factoriesAI infrastructuredata centersGPU computing
Details →
White PaperOpen Compute Project FoundationApril 2026Facility Design & Construction

Open Data Center for AI

This strategic white paper from the Open Compute Project outlines its Open Data Center for AI program, focused on deploying gigawatt-scale AI data centers. It calls for open reference site designs, standardized grid-interconnection practices, SLAs for third-party operators, integrated telemetry across IT and facility infrastructure, and consistent power-assessment methodologies. The initiative aims to accelerate AI data center construction and grid connection, increase infrastructure reuse, and reduce the risk of supply-chain misalignment.

AI data centersgigawatt-scale data centersdata center reference designsliquid cooling
Details →
White PaperOpen Compute Project FoundationMarch 2026Power & Energy Supply

Low-Voltage DC Power Distribution for Data Center Infrastructure

This Open Compute Project white paper examines low-voltage DC (LVDC) power-distribution architectures for data centers amid rapid growth in AI workloads and rack power density. It compares staged pathways from conventional AC power to DC distribution, covering power-conversion boundaries, grounding, protection, energy storage, reliability, and grid interaction. Rather than prescribing a single topology, the document establishes a technical framework for data center operators, designers, manufacturers, utilities, and regulators.

Data CentersAI InfrastructureLVDCDC Power Distribution
Details →
White PaperAVK; Wärtsilä EnergySeptember 2025Power & Energy Supply

Data Centre Dispatchable Capacity: A Major Opportunity for Europe’s Energy Transition

This AVK and Wärtsilä Energy white paper examines constrained grid capacity as a major barrier to the expansion of European data centres, particularly facilities serving AI workloads. It proposes on-site microgrids combining dispatchable generation, BESS and renewables to accelerate site energisation before—or independently of—a grid connection. The paper compares power-system scenarios and four supply configurations for a representative AI data centre in terms of cost, reliability, land use and carbon footprint.

Data Centre Power SupplyAI Data CentresMicrogridsDispatchable Generation
Details →
White PaperCummins Inc.November 2024Power & Energy Supply

Evolution of Data Center Onsite Power Use

This Cummins white paper examines the shift in data center onsite power systems from traditional emergency backup toward an active-standby model. It identifies decarbonization and shortages of grid capacity and transmission capability—particularly acute in Europe and North America—as the key drivers. The paper considers cleaner fuels and generation technologies, energy storage, fuel cells, and microgrid controls that could enable data centers to support the grid without moving to continuous onsite generation.

Data Center Power SupplyOnsite GenerationActive StandbyGrid Constraints
Details →
White PaperASHRAEMay 2021Cooling & Thermal

Emergence and Expansion of Liquid Cooling in Mainstream Data Centers

An ASHRAE technical white paper on the factors accelerating the transition of data centers from predominantly air-based to liquid cooling. The document links rising CPU, GPU, FPGA, and memory power levels to the limitations of air-based systems in terms of airflow, temperature, noise, rack density, and personnel safety. It examines ASHRAE water classes, direct liquid cooling and immersion cooling, and the implications for PUE, TCO, power delivery, heat reuse, and deployment in enterprise, HPC, and colocation data centers.

Liquid coolingDirect Liquid CoolingImmersion coolingData center cooling
Details →
White PaperSiemens Gas and PowerSeptember 2019Power & Energy Supply

On-site Power Generation for Data Centers: How Gas Turbines Deliver Maximum Availability

This Siemens Gas and Power white paper examines on-site generation of electricity and cooling for data centers as an alternative to reliance on a constrained or unreliable external grid. Its main focus is on modular gas-turbine solutions, including open-cycle and combined-cycle configurations, combined heat and power (CHP) with absorption cooling, redundancy, and operational lifecycle considerations. The paper also outlines approaches to planning, EPC delivery, service, and decarbonization through biofuels and hydrogen.

Data centersOn-site generationGas turbinesCombined Cycle
Details →